Skip to content
Triple Play Plumbing, Heating & Air

Recent Work in Del City, OK

12 recent jobs photographed on site in Del City and nearby. Every photo is our own crew’s work — no stock imagery.

Ceiling-mounted duct and return air vent with white trim.

Ceiling duct work and return vent installed during air duct cleaning service in Del City.

Air Duct Cleaning · November 2026

Furnace return air filter showing dust accumulation before cleaning.

Dirty air filter and furnace return inspected and documented during air duct cleaning in Del City.

Air Duct Cleaning · November 2026

Newly installed gray HVAC condenser unit mounted on concrete pad against brick wall

New HVAC condenser unit installed and connected to the home exterior in Del City.

HVAC Installation · October 2026

Tankless water heater mounted in home utility closet with black venting

New tankless water heater installation in utility closet with properly routed venting during HVAC and plumbing work in Del City.

HVAC Installation · October 2026

Clean rectangular return air grill installed in ceiling

Return air grill cleaned and inspected during an air duct cleaning service in Del City.

Air Duct Cleaning · October 2026

Clean return air intake grill in basement wall

Basement return air intake cleaned during air duct cleaning service in Del City.

Air Duct Cleaning · October 2026

Ductwork damper and interior during cleaning process

Damper mechanism and interior ductwork cleaned during air duct cleaning service in Del City.

Air Duct Cleaning · July 2026

Clean ductwork interior with damper mechanism visible

Cleaned ductwork damper and interior during air duct cleaning service in Del City.

Air Duct Cleaning · July 2026

Fiberglass insulation batts installed between attic floor joists in Del City home.

New attic insulation installed in Del City home, showing fresh fiberglass batts laid across the attic floor between wooden joists.

Attic Insulation · May 2026

Properly installed fiberglass insulation batts in attic space with wooden framing.

Attic insulation project in Del City showing fiberglass batts properly installed throughout the space with clear structural framing visible.

Attic Insulation · May 2026

New fiberglass insulation batts and ductwork in attic installation.

Attic insulation installed in Del City showing new fiberglass batts and ductwork properly positioned throughout the attic space.

Attic Insulation · May 2026

White GFI outlet with orange indicator lights mounted in wall plate.

New GFI outlet installation completed during electrical service in Del City.

Electrical Service · January 2026

← All recent work

24/7 Emergency Service

Need it fixed today? We answer 24/7.

Guaranteed reliable service or your money back.

Call Now Book Online